30%

AVERAGE CAPITAL COST REDUCTION

30%

AVERAGE OPERATING COST REDUCTION

1Year

AVERAGE TIME FOR PILOT PLANT EXECUTION

50%

COST REDUCTION FOR COMMERCIAL SYSTEMS

PROCESS DEVELOPMENT

From fuels, commodity chemicals, specialty chemicals, consumer products to renewable chemicals, our team has helped Fortune 500 companies with process development for new technologies as well as for improving existing production facilities. We have best in the world capabilities in reactor design, separation system design, process intensification and process optimization. We generate critical Intellectual Property for our clients.

PILOT PLANTS

We have world-class capabilities in pilot plant design, construction and operation. Our dedicated team of engineers can help you design your next pilot plant for successful scale-up at an accelerated pace. We offer skid-mounted pilot plants fabricated at a dedicated construction facility as well as the option to operate the pilot plant on a tolled basis. Our staff includes process engineers, operators and analytics personnel.

SKID MOUNTED COMMERCIAL PLANTS

With on-site construction costs soaring, skid-mounted equipment systems provide better, cheaper and faster option to control cost and schedule. Our skid-mounted systems will reduce construction costs by at least 30%, implementation time reduction of 50% and provides higher quality performance with better safety since skid-mounted systems are constructed in a controlled environment. We can supply commercial scale skid-mounted equipment all the way from 10 tons/day to 1,000 tons/day. Skid-mounted systems include: reactors (fixed bed, stirred tanks, fluidized bed), separation systems (extraction, distillation, adsorption) as well as special purpose systems.

OUR TEAM HAS DEVELOPED TECHNOLOGIES FOR

Join our mailing list to get the latest news & events.